Construction Update - July 16, 2026

In this issue

  • REMINDER: Speed Limit is 25 M.P.H. in the Work Zone
  • 8-Inch Water Main Installation Starts Monday
  • Project Overview
  • Construction Notes

REMINDER: Speed Limit is 25 M.P.H. in the Work Zone

A reminder to all motorists: the speed limit through the construction zone is 25 M.P.H. Unfortunately, drivers have been observed speeding through the work zone, creating unsafe conditions for construction crews and the public. Roadway conditions in the work area can change quickly. Crews, equipment, flaggers, and uneven pavement may be present at any time. Please slow down, stay alert, and help keep everyone safe.

8-Inch Water Main Installation is Underway

[updated!] Work on the 16-inch water main is now complete. Installation of the 8-inch water main on Calistoga Road is underway and is expected to continue through the end of today. Starting Monday, July 20, the contractor will begin installing water laterals in the area. Water laterals are the smaller lines that carry water from the main to individual residences. Installation of water laterals is expected to continue through the end of next week.

If you're wondering why different-sized pipes are needed, the larger 16-inch water main helps move water throughout the City's water system, while the smaller 8-inch water main delivers water directly to nearby homes and businesses. Along this section of Calistoga Road, both water mains run parallel to one another.

While crews are working in this area, there may be intermittent times when work takes place in the Calistoga Road/Dupont Drive intersection. When this happens, traffic from Dupont Drive to Calistoga Road will be detoured onto Grove Avenue, then Marit Drive, and back onto Calistoga Road. Please respect the neighborhood! Motorists using the detour are reminded to observe posted speed limits while traveling through the surrounding residential streets.

The flashing red light at the Calistoga Road/Dupont Drive intersection will continue to be in that mode while this work is underway. When approaching a flashing red signal, treat it as a four-way stop. Come to a complete stop, yield to vehicles and pedestrians already in the intersection, and proceed slowly when it is safe to do so.

Traffic control measures, including lane shifts, will remain in place during the water main installation — motorists should expect traffic delays. Please follow all posted construction signage and directions from flaggers on-site. Use extra caution and be sure to watch for trucks, equipment, and work crews.

Thank you for your continued patience as we work to improve this corridor. We apologize for disruptions and traffic delays this project may be causing.

Schedules are subject to change due to weather and other unforeseen circumstances

 

Placement of 8-inch water main

Filling and compacting trench after pipe placement

Project Overview

The Calistoga Road Pavement Rehabilitation & Utility Improvement project will repair and restore approximately 1.1 miles of Calistoga Road using Full Depth Reclamation and mill and fill paving techniques to address worn and deteriorating road conditions.

Improvements will also include adding buffered and protected bike lanes in select locations while maintaining existing bike lanes elsewhere, improvements to bus stop infrastructure, and pedestrian curb ramps upgraded to current ADA standards.

In addition to roadway improvements, the project includes  water and sewer system upgrades, including approximately 7,629 linear feet of water pipe replacement and 1,825 linear feet of sewer pipe replacement.


 

Construction Notes

As with all large construction projects, there will be unavoidable disruptions to nearby neighbors and to motorists traveling in the area – we apologize in advance for noise, dust, lane closures, traffic delays, and any other impacts or inconveniences. When driving, cycling, or walking in the area, always be aware of construction crews and equipment, flaggers, special signage, slower traffic, and changing roadway conditions. Use an alternate route if possible, and allow for additional time to get to and from your destination.

Typical working hours are 7:00 a.m to 5:30 p.m. During those hours traffic control measures and lane closures may be in effect.

Night work (8:00 p.m. to 5:00 a.m.) and weekend work may occur with advance notice.

If you have questions or concerns about this project, send an email to [email protected] or call the project information line at (707) 387-4031.

Thank you for your patience and cooperation!